We had some erosion and decided to "upgrade" our lower level landing/walkway/patio. We removed most of the concrete walkway and put in a road bed for stability and then sandstone pavers on top. The sandstones were delivered in pieces that were about 6 feet by 4 feet by 3 inches. They weighed a ton. No...more than that. The biggest piece that Cole and I could get on a wheelbarrow was 3x3 and it was all we could handle. So we used a seldge to make the rest of the pieces smaller, much smaller. Here are some photos that show the finished product.