Tuesday, June 3, 2008

Lower level concrete walkway/patio poured



It took about six weeks to get the concrete work done outside the basement. I figured that since the housing slump is in full swing that getting concrete would be easy. Not true. But they are done and we can now install the air conditioner. Interestingly, we have not needed A/C yet this year. Today the high was 75 and tomorrow we expect rain and 60 degrees. Summer is on the way but took a detour this year.