Thursday, October 11, 2007

Plumbing


It only took three days but the rough pluming is complete. Not much to see expect for this photo. This is the main water mainfold and it is made entirely out of plastic. The red lines are for hot water and blue for cold. Each line goes directly to a faucet without any copper or soldering. The lines are also much stronger than copper -- copper joints break at less than 100PSI and this stuff holds to almost 1000 PSI.

No comments: